Skip to content
P&A Consulting
Pool villa in Phuket at dusk
Buying

Buying a villa in Phuket: the technical checks to make before you sign

By Philippe LaneryPublished 2 November 20269 min read

Key takeaways

  • A lawyer's due diligence covers the title, the ownership structure and the contract. It does not tell you whether the building is sound.
  • Do the technical audit before the deposit becomes non-refundable, or make the deposit conditional on it.
  • In Phuket, most expensive defects are about water: roofs, terraces, pools, drainage and hillside retaining walls.
  • Off-plan, there is no building to inspect yet: what protects you is the developer's track record, the specifications and payments tied to progress.

Phuket is one of the most attractive villa markets in Asia, and most buyers do things properly: they hire an independent lawyer, check the title deed and register their lease or their company at the Land Office. Yet many of the costly surprises we see have nothing to do with the paperwork. They are hidden in the building itself, behind the tiles, under the pool or inside a hillside.

This guide lists the technical checks to make before you commit to a villa in Phuket, whether you are buying a resale property or a villa that is still on plan. It is written from the owner's side, by someone who spent 35 years on the builder's side.

“My role is to ensure that your project is realised with the lowest possible level of risk.”
Philippe Lanery

Your lawyer checks the title. Who checks the building?

Legal due diligence and technical due diligence answer two different questions. Your lawyer tells you whether you can safely own or lease the property: the type of title deed (a Chanote is the strongest), the land's encumbrances, the ownership structure open to a foreign buyer, and the terms of the sale and lease agreements. That work is essential, and it is not ours.

The technical audit tells you what you are actually buying: how the villa was built, what condition it is in, what will need repairing in the next few years and how much that may cost. A beautiful listing photo says nothing about the waterproofing under the terrace or the drainage behind the retaining wall.

QuestionWho answers it
Can I legally own or lease this land and villa?Your independent Thai lawyer
Is the title deed clean, and is the lease registered?Your lawyer, with the Land Office
Was the villa built with a permit, and does it match the drawings?Your lawyer for the permit; a technical review for the match on site
Is the structure sound and the building watertight?A technical audit, with specialist tests where needed
What will I have to repair, and what will it cost?A technical audit, with contractor quotes
“In order, what buyers most often discover after the purchase is waterproofing problems, then structural ones. Next come the building services: electrics, air-conditioning, plumbing. There are also smaller issues with the outdoor areas and landscaping. And, of course, problems with the land's legal documents.”
Philippe Lanery

When to do the technical audit

The right moment is before your deposit becomes non-refundable. In practice, that means one of two things: either the audit takes place before you sign the reservation or sale agreement, or the agreement states that the deposit is refundable if the technical audit reveals defects above an agreed threshold. Your lawyer can draft that clause; the audit gives it substance.

If you live abroad, the audit does not require you to be in Phuket. The visit, the photos and the report can all be shared remotely, so you can decide from Moscow, Paris, Hong Kong or Sydney with the same information as someone standing in the living room.

1. The documents the seller should provide

A well-built villa leaves a paper trail. Before any visit, ask the seller or the developer for the documents below. Missing documents are not always a red flag, but they tell you where to look harder.

Documents to request

  • Building permit and completion documentsYour lawyer checks that they exist and match the title. We compare them with what was actually built.
  • Architect's drawings and, ideally, as-built drawingsExtensions, an added floor or a pool not shown on the drawings are common, and can affect insurance and resale.
  • Structural calculations or the engineer's approvalEspecially for hillside villas, cantilevered terraces and infinity pools.
  • Warranties and invoicesWaterproofing, pool equipment, air-conditioning, solar panels: who installed them, when, and is anything still under warranty?
  • Maintenance historyRoof and pool repairs, leak repairs, pest treatments. Repeated repairs in the same place usually mean the cause was never fixed.
  • Utility billsElectricity and water consumption say a lot about air-conditioning efficiency, insulation and possible leaks.

2. Structure and site: slopes, walls and cracks

Many of Phuket's most sought-after villas sit on hillsides with sea views. That is where structural questions matter most. The points we look at first:

  • Retaining walls: bulging, cracks, missing or blocked weep holes. A retaining wall that cannot drain holds water behind it, and water is what pushes walls over.
  • Site drainage: where does rainwater go during a tropical downpour? Look for erosion marks, stained walls and water paths across the plot.
  • Cracks: hairline cracks in render are common; diagonal cracks from the corners of openings, or cracks that run through the structure, need an engineer's opinion.
  • Terraces and cantilevers: sagging, rust stains on the underside or exposed reinforcement mean water has reached the steel.

3. Water: roofs, terraces, pools and the monsoon test

Phuket receives most of its rain during the southwest monsoon, roughly from May to October. A villa visited in the dry season can look perfect and leak at the first heavy storm. Water is behind most of the expensive defects we see, because it is usually discovered once the finishes have to be removed.

  • Flat roofs and roof terraces: ponding water, cracked membranes, poorly sealed drains and parapets.
  • Ceilings and walls under terraces and bathrooms: stains, bubbling paint, fresh repainting in one spot only.
  • Pool: water loss beyond normal evaporation, cracks in the shell or the coping, the condition of the plant room. A leak test by a pool contractor is cheap compared with a hidden leak under the deck.
  • Window and door frames: sealing, rust on fixings, signs of water coming in during driving rain.
  • Mould and humidity: a musty smell in wardrobes or closed rooms is often the first sign.
“In the dry season, I start with the base of the structure: the foot of the pillars and walls. If it has been damaged by water, it means water stands or runs there during the monsoon. Then I look at the roof: a flat roof terrace needs proper waterproofing. Inside, I look at whether the walls were repainted just before the viewings. There is no reason to repaint the inside of a villa every season. On the facades, the condition of the masonry, paint and exterior finishes tells you a lot. Finally, I look at the sealant joints around the glazed frames and doors, and at the corners of the rooms: that is where you often find mould or traces of past damp.”
Philippe Lanery

4. Electrical, air-conditioning, water and wastewater

Technical installations are rarely what a buyer looks at, yet they are expensive to replace and essential for rental income.

  • Electrical board: age, labelling, earthing and residual-current protection. A licensed electrician should test it; we tell you when it is worth doing.
  • Air-conditioning: age and brand of the units, condition of outdoor units exposed to salt air, condensate drainage.
  • Water supply: tank, pump and pressure, water treatment, and whether the villa depends on deliveries in the dry season.
  • Wastewater: type of septic or treatment system, its capacity for the number of bedrooms, and its maintenance. Odours around the garden are a warning sign.
  • Solar panels and smart-home systems: who maintains them, and does anyone still have the access codes?

5. Salt, humidity and materials

A tropical seaside climate ages buildings fast. Close to the sea, check for corrosion on railings, fixings, air-conditioning units and exposed steel. Wooden decks and pergolas need proper treatment against humidity and termites. None of this is a reason to walk away, but it all belongs in your renovation budget.

Buying off-plan: check the developer and the contract, not the brochure

When the villa does not exist yet, there is nothing to inspect. Your protection is in the developer's track record, the technical specifications attached to the contract and the payment schedule. A brochure is not a specification: if the brand of the windows, the type of waterproofing or the pool equipment is not written in the contract, you have no way to require it at handover.

The brochure saysWhat to ask for
“Premium finishes”A specification annex listing brands, models and materials, room by room
“Completion in 18 months”A schedule with milestones, and late-delivery penalties in the contract
“Payment in 5 instalments”Instalments tied to verifiable progress on site, not to calendar dates
“Built to international standards”The structural engineer's name, the building permit and the insurance certificates
“10 villas already sold”The address of completed projects you can visit, and owners you can talk to
“I look first at the written specifications, and whether they match what is being offered. In a serious sale agreement, everything is described: floor and wall finishes, ceilings, light fittings, sanitary ware, furniture, the kitchen and its appliances, as well as ceiling heights, including under the false ceilings. When something is not described, or stays vague, you have it added and spelled out in writing. If the developer accepts, it means they are committing to deliver it.”
Philippe Lanery

We review the contract's technical clauses and the specifications with your lawyer, then follow the works on your behalf: site visits, photo reports, and evidence requested from the contractor before each payment and before anything gets covered. See our contract and BoQ safeguards and construction monitoring.

What a pre-purchase audit report gives you

A useful audit ends with a decision, not just a list of defects. Our pre-purchase technical audit report gives you:

  1. A clear view of the villa's condition: what is sound, what needs attention, what needs a specialist test.
  2. A repair and renovation estimate, based on contractor quotes where possible, to use in your price negotiation.
  3. The list of documents and guarantees to obtain from the seller before signing.
  4. A plain recommendation: go ahead, negotiate, or walk away.

What skipping the checks can cost

The situationDiscovered after the purchaseFound before signing
Leaking roof terraceFinishes removed and redone at your expense, rental season lostRepair priced and deducted from the price, or fixed by the seller
Pool shell leakDeck demolished to find itLeak test requested before the deposit
Undersized wastewater systemOdours and complaints from guestsReplacement included in the renovation budget
Extension without permitInsurance and resale problemsRegularisation required from the seller, or price adjusted
Off-plan villa with vague specsCheaper materials at handover, nothing to claimSpecification annex signed with the contract

Whatever you buy, keep everything in one place: drawings, permits, contracts, warranties and maintenance records. That file is what the next buyer, your insurer and your rental manager will ask for. It is also why every project we follow ends with a digital handover book.

Frequently asked questions

Philippe Lanery

Philippe Lanery

Founder & Owner's Representative, P&A Consulting

Philippe built and ran construction companies in Monaco and France for more than 30 years: luxury residences, palaces, casinos and hundreds of commercial sites. Based at Royal Phuket Marina, he now works exclusively for owners.

This article is general information, not legal or tax advice. Ownership structures, titles and permits must be checked by an independent Thai lawyer. Technical checks are carried out and certified by the relevant contractors, engineers and inspectors; P&A Consulting reviews the evidence and advises the owner.

Let's talk

Protect your Phuket project before the first signature.

Tell us about your project. We will get back to you within 24 hours.

By sending this form, you agree to be contacted about your project.

Contact us