Skip to content
P&A Consulting
Energy

EDF Valabres hydro plant

Fit-out inside a power plant dug into rock.

The challenge

Fit out the control room of a strategic underground hydroelectric plant, dug into the rock, with restricted access and the safety rules of a high-voltage site.

What was delivered

  • Control room layout: technical furniture, control desks and industrial flooring
  • False ceilings, partitions and finishes built to resist moisture underground
  • Supply logistics through a tunnel entrance with restricted access

Key results

  • Works carried out to EDF Production quality and safety standards
  • Full compliance with hydraulic and high-voltage safety protocols

What this means for your Phuket project

Humidity is the enemy of every building in Phuket. Philippe has built in some of the dampest environments possible, and knows which materials and details really hold up.

  • EDF Valabres hydro plant (1)
  • EDF Valabres hydro plant (2)
Let's talk

Protect your Phuket project before the first signature.

Tell us about your project. We will get back to you within 24 hours.

By sending this form, you agree to be contacted about your project.

Contact us